PET 4802 Project (2) (2+3+3)
Studying and discussing elective topics in petroleum engineering related to drilling, production, reservoir and processing. An Egyptian oil field is selected to carry out a study in exploration, drilling, development, production, reservoir engineering and economic evaluation during four weeks started after the final exams.